Business

BEST to hold special smart meter billing camps from November 23 to December 4

· 1 source · Bihar edition

This story has no audio yet

The Brihanmumbai Electric Supply and Transport Undertaking, or BEST, will launch a campaign called BEST 2.0 from November 23 to December 4 to address consumer grievances over electricity bills. Complaints have continued to surface about sharp, unexplained increases after smart meters were installed. Customer care camps will be held at designated BEST wards between 10 am and 4 pm on specific days, with help desks staffed by appointed officers.

An official said the campaign aims to reduce communication gaps. Technical teams will conduct on-site inspections of smart meters in the presence of consumers. Sources said that if a consumer questions a meter's accuracy, BEST will install a check meter to compare readings. BEST Committee member Nitin Nandgaonkar cited cases where monthly bills reportedly rose from Rs 9,000-10,000 to nearly Rs 25,000 and sought greater transparency.

K Shenoy, a power expert who has opposed smart meter installation, said the rollout should be slowed down. He claimed installation is not mandatory for undertakings such as BEST and should be followed by state-run distribution companies. BEST had held a similar campaign between September 28 and October 9.

Key points

  • BEST will run the BEST 2.0 campaign from November 23 to December 4 to address billing complaints.
  • Customer care camps will be held at designated BEST wards between 10 am and 4 pm on specific days.
  • Technical teams will inspect smart meters on site, and a check meter will be installed if a consumer disputes accuracy.
  • BEST Committee member Nitin Nandgaonkar cited bills reportedly rising from Rs 9,000-10,000 to nearly Rs 25,000.

Coverage from

This story was put together automatically from the sources above. Open a source to read its original report. How nuze makes stories