Transport
Nitish Setu over Ganga to link Raghopur with Patna; inauguration due next day
The Nitish Setu, a permanent bridge over the Ganga, is set to open in Raghopur in Vaishali district, where residents say it is the first such link since independence. Its inauguration is scheduled for the next day, and it is expected to connect the Diara region directly with Patna.
Residents said that when the pontoon bridge was removed in the rains, the area became cut off like an island, and people depended on boats for hospital trips, exams and selling produce. The Patna journey, which took two to three hours, is now expected to take 20 to 25 minutes. From the Rustampur-Jafarpatti side, the bridge can be reached after 8 to 10 kilometres.
Raghopur is the constituency of Leader of Opposition Tejashwi Yadav, and residents said politics aside, everyone would benefit. Women expect easier access to Patna for childbirth and emergencies, while traders and farmers hope milk, bananas and vegetables can reach Patna markets. Some access roads are still being built, and locals want them finished quickly and a bus service started.
Key points
- The Nitish Setu over the Ganga is due to be inaugurated the next day, linking Raghopur with Patna.
- Residents say the trip to Patna, once two to three hours, may now take 20 to 25 minutes.
- During the rains, the area was cut off by boat when the pontoon bridge was removed.
- Patients, women, students and farmers are expected to benefit most, according to residents.
- Some access roads are still under construction, and locals have sought a bus service.
Coverage from
Topics
This story was put together automatically from the sources above. Open a source to read its original report. How nuze makes stories