Transport
DevelopingRailways to cancel ten trains from December 6 for Bilaspur-Jharsuguda line work
The 206-kilometre fourth rail line between Bilaspur and Jharsuguda is in its final stage. The busy corridor links northern and southern India. South East Central Railway is moving quickly on several projects to strengthen infrastructure and meet future traffic needs. Once the fourth line is finished, the route's capacity will rise considerably, and passenger and freight traffic will be easier to manage.
The last section, between Champa and Naila, has already been laid. Work to connect Champa station to the new line will be carried out through non-interlocking work. Auto signalling at Naila station is also due, and railways have decided to cancel ten trains from December 6 to complete it. Six trains will be terminated midway, and some trains will leave late.
Among the changes, the Gondia-Jharsuguda MEMU will end at Bilaspur from December 7 to 18, while the Korba-Amritsar Chhattisgarh Express will start from Bilaspur. The Korba-Raipur Hasdeo Express will run as a passenger train between Korba and Bilaspur from December 7 to 18.
Key points
- Railways have decided to cancel ten trains from December 6 for auto signalling work at Naila station.
- Six trains will be terminated midway, and some trains will leave late.
- The Champa-Naila section of the 206-km fourth rail line has been laid.
- Champa station is to be connected to the new fourth rail line.
Coverage from
This story was put together automatically from the sources above. Open a source to read its original report. How nuze makes stories